scdnr logo

Mapping Needs Update Support System
(MNUSS)

MNUSS DATA WORKSHEET



Community Name:   CID:
Worksheet Completed By:    Date Completed:
                           Input By:             Date Input:

ORIGIN (Source of Information)
Entity (Organization/Agency):
Last Name:    First Name:    Title: 

Address: Phone
Fax:
Email:

MAP MAINTENANCE UPDATE: Multiple Maintenance needs should be recorded on the same worksheet.

Need Type - Maintenance  Affected Map Panels and Date (Fill in all that apply)
Add streets to panel  
Add Elevation Reference Marks (ERMs)  
Align contiguous map panels  
Add Letter of Map Changes (LOMCs)  
Convert to countywide format  
Annexations and Corporate Limit corrections  

FLOOD DATA UPDATE: Complete a separate worksheet for each flooding source or study reach.

Study Category (check one):  Riverine   Coastal    Alluvial 

Flooding Source:

Need Type - Flood Data Update  Affected Map Panels and Date (Fill in all that apply)
Changes to hydrologic condition  
Changes to hydraulic condition  
Changes to floodplain width  
Changes to Base Flood Elevations (BFEs)  
Changes to coastal elevations  

Average Change in BFE  (Check anticipated increase or decrease (+/-) and range in feet):  + 0-1 ft                                                  
                                                                                                                                             + 1-5 ft    
                                                                                                                                             +  >5 ft   
                                                                                                                                              - 0-1 ft
                                                                                                                                              - 1-5 ft
                                                                                                                                               - >5 ft

Length of Study Reach:  (miles)*       Alluvial Fan Area:  (sq. miles)
*Identify beginning and ending points below using physical landmark descriptions (e.g. bridge/road crossings) for "Length of Study Reach".

Beginning point:    Ending point: 

Average Width of Floodplain:  (feet)

Notes:
   

or

CONTACT:
Maria Cox
Associate Engineer
Flood Mitigation Program
P.O. Box 167, 1000 Assembly Street
Columbia, SC 29202
E-mail coxm@dnr.sc.gov
Phone: (803)734-9493  Fax: (803)734-9106